AMAZON COMMERCIAL AB-P100 Manual De Instrucciones página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Step 4:
Connecting power: Secure power supply cord to discharge pipe using cable or
zip ties to prevent possible switch entanglement. Connect pump power supply
cord to a ground fault circuit interrupter (GFCI) receptacle.
Step 5:
Operating the pump: Fill the basin/pit with water,the pump will start when the
water level has reached the switch-on level. The pump will stop when the water
level has reached the switch-off level.
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

‎ab-p101

Tabla de contenido