Section 3 Installation; Installation Procedure; Installation Of The Split Heavy Duty Package (Shd) - ESAB MIG 4HD Manual Del Usuario

Tabla de contenido

Publicidad

SeCTION 3
All manuals and user guides at all-guides.com
3.0 INSTAllATION PROCeDURe
Assemble the boom according to the installation instructions provided. Next, install
and assemble the appropriate SHD or FHD wire feeder boom package as follows:
3.1 INSTAllATION OF The SPlIT heAVY DUTY PACKAGe (ShD)
(Wire Drive / Drive Box mounted at end of boom arm &
control box mounted on boom mast)
A.
INSTALLING THE WIRE DRIVE / DRIVE BOX ASSEMBLY
Install the Wire Drive / Drive Box Assembly using the (4) 1/4-20 x .75 bolts with lock
washers and nuts. Mount the Wire Drive / Drive Box Assembly at the end of the boom
arm by lining up the holes of the Wire Drive / Drive Box Assembly with the holes
on the Feeder Mount Bracket. After the Wire Drive / Drive Box Assembly is in place,
completely tighten the bolts.
Wire Drive / Drive Box
Assembly
B.
INSTALLING THE CONTROL BOX ASSEMBLY
Install the Control Box Assembly using the (2) 1/4-20 x 1.50 bolts with flat washers,
lock washers and nuts. Mount the Control Box Assembly on the provided Control Box
Support Assembly by lining up the holes. After the Control Box Assembly is in place,
completely tighten the bolts.
22
INSTAllATION
Control Box Support Assembly
Control Box Assembly
Feeder Mount Bracket

Publicidad