Placement And Orientation Of Covers - Rehabmart Paramount PCC Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Placement and Orientation of Covers

Determine location and configuration of cable management that best routes cables from component to outlets.
1
Example of configurations are shown below. Cable management covers (A) can be cut for a desired length as
shown in detail 1.
NOTE: It is recommended that a hacksaw be used in order to cut cable covers to desired length prior to installation.
VERTICAL LEFT CONFIGURATION
SCREEN
OuTLET
HORIzONTAL LEFT CONFIGURATION
SCREEN
OuTLET
using a level, draw a vertical line
2
indicating the center of the covers
in the vertical orientation. Mark
mounting holes on the centerline
down the length of covers (if covers
are not cut, length will be 18").
If routing cables to left or right,
draw a level horizontal line 3"
(76 mm) below the last vertical
mounting hole. Mark the center
of the first horizontal mounting
hole 3" (76 mm) to the left or right
depending on orientation.
Mark mounting holes between
vertical and horizontal mounting
holes.
VERTICAL RIGHT CONFIGURATION
SCREEN
OuTLET
HORIzONTAL RIGHT CONFIGURATION
18"
OR
LENgTh
OF CUT
COVER
3"
(76 mm)
3"
(76 mm)
4 of 24
CaN BE
CUT FOR
DESIRED
LENgTh
SCREEN
OuTLET
MArk
BETWEEN
MOuNTINg
hOLES
18"
Or LENgTh
OF CUT
COVER
ISSUED: 04-23-08 SHEET #: 120-9046-1
DETAIL 1
A
18"
Or LENgTh
OF CUT
COVER

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Paramount pcc-bParamount pcc-s

Tabla de contenido