1. INSTALLATION
3
0479D
0480D
S-7100A
3. Rubber cushions
(1) Rubber cushions [2 pcs]
(2) Nails [4 pcs]
(3) Head cushions (left) [2 pcs]
(4) Head cushions (right) [2 pcs]
4. Machine head
(1) Hinges [2 pcs]
(2) Machine head
(3) Head rest
[NOTE]
・Bind the cords together and pass
them through the cord hole.
・Tap the head rest (3) securely into
the table hole. If the head rest (3) is
not pushed in as far as it will go, the
machine head will not be sufficiently
stable when it is tilted back.