Descargar Imprimir esta página

Uline H-3760 Guia De Inicio Rapido página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

5. Insert screwdriver into camlock and turn clockwise to
lock. Repeat for all camlocks. (See Figure 5)
Figure 5
NOTE: Tilt screwdriver at an angle while twisting
to better lock the camlocks.
CASTERS INSTALLATION (OPTIONAL)
1.
Position casters into the four outer corners and two
into the center corners, with one caster on either
side of the center kick base board. (See Figure 6)
2. To attach casters, screw four pan head screws per
caster through holes in caster and into the predrilled
holes inside the kick base boards. (See Figure 7)
CENTER AND WING PANEL INSTALLATION
1.
Flip the kick base right side up.
2. Set the four dowel pins into the predrilled holes on
the base top.
NOTE: Two people are recommended for steps
3 through 6.
3. Set one wing panel onto two of the dowel pins.
(See Figure 8)
4. Set one center panel onto the base top and
attach to wing panel by screwing confirmat screws
through predrilled holes. Tighten screws with Phillips
screwdriver. (See Figure 8)
5. Set the second tier of the center panel on top of the
first panel and secure to wing panel the same as
step 4.
6. Set second wing panel onto dowel pins and secure
to center panels by screwing confirmat screws
through predrilled holes. Tighten screws with Phillips
screwdriver. (See Figure 9)
7. To cover the exposed screw heads, peel the
decorative screw caps to expose the sticky back,
and carefully center and cover the screw heads.
NOTE: A black magic marker can be used to
touch up any dings or nicks to the kick base
boards. Clean with soft rags and water.
PAGE 2 OF 6
ASSEMBLY CONTINUED
Figure 6
Figure 7
Figure 8
Wing Panel
Figure 9
1-800-295-5510
uline.com
Center Panel
Dowel Pin
0521 IH-3760

Publicidad

loading

Este manual también es adecuado para:

Gondola h-3760