Descargar Imprimir esta página

Initial Operation - JBL PRO FLORA TAIFUN SPIRAL 5 Manual Del Usuario

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 27
Parts and description
UK
Lower part with hose connection.
1
Lid for lower part (to prevent slugs entering).
2
Modules.
3
JBL PRO FLORA CO
JBL PRO FLORA CO
Collection cap to prevent CO
4
CO
5
Holding clip with suction pad.
6
JBL PRO FLORA CO
JBL PRO FLORA CO

Initial operation

First thoroughly rinse the reactor in lukewarm water. Do not
use detergents.
Fit the reactor vertically in the aquarium in a position where
there is a gentle current. The upper edge of the device
needs to be at least 2 cm under the surface of the water.
Connect the CO
systems (e.g. JBL PRO FLORA CO
hose connection of the reaction vessel, with systems
using pressurised gas cylinders to the hose connection of
the pressure regulator fitting. First let a few bubbles run
through the device.
At first the bubbles will flow intermittently through the
spiral bubble channel from the bottom to the top. The
8
device needs approx. 48 hours to set-up. Only then will a
2
2
hose JBL PRO FLORA CO
2
2
2
hose to the CO
2
TAIFUN SPIRAL 10 : 10 x
TAIFUN SPIRAL 5 : 5
loss.
2
TAIFUN TUBE BLACK .
2
TAIFUN SPIRAL 10 : 4 x
TAIFUN SPIRAL 5 : 1 x
source: with bio-CO
2
BIO BASIC ) to the
2
2

Publicidad

loading

Este manual también es adecuado para:

Pro flora taifun spiral 10