Descargar Imprimir esta página

Installation; Operating Environment; Connecting To Network Devices; Connecting The Power - BenQ SP000S Manual Del Usuario

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 26
All manuals and user guides at all-guides.com
8PUG.book Page 4 Friday, August 9, 2002 5:32 PM

2. Installation

2.1. Operating Environment

This switch must be installed and operated within the limits of specified
operating temperature and humidity (see previous section under Specifi-
cations).
• Do not place objects on top of the unit.
• Do not obstruct any vents at the sides of the unit.
• Do not position the unit near any heating source such as heater,
radiator, or direct exposure to sun.
• Prevent entering of water and moisture into the unit.
• If necessary, use dehumidifier to reduce humidity.
• Always avoid dust and dirt.
• Allow some space between the product and the surroundings to
facilitate dissipation of heat generated inside the switch.

2.2. Connecting to network devices

The RJ-45 ports on the switch are designed as MDI/MDI-X auto cross-
over ports which allow using straight-through cables to connect any port
on this switch to network device.
Connect one end of the network cable to the RJ-45 port on the rear
panel, and then connect the other end of the network cable to the RJ-45
port on the network device. Follow the same procedure to connect all
the RJ-45 ports of the switch. The UTP network cables must comply with
EIA/TIA 568 specifications and Category 5 standard for 100Mbps data
transmission and Category 3, 4, 5 for 10Mbps connection. Maximum
length, using UTP cable, between the switch and connected device is 100
meters (328ft). Once the network cable is connected to both ends and
the attached network device is powered on, the green LINK/ACT 10/100
LED should be lit (for 100-Base data linked by auto-negotiation).

2.3. Connecting the power

Connect the output end of the power adapter to the power connector
on the rear panel of the unit. Connect the power adapter to the power
outlet. The green Power LED on the front panel should be lit.
2. Installation - 4

Publicidad

loading

Este manual también es adecuado para:

Sp0008Sp0016Sp0005