Descargar Imprimir esta página

GLOBAL OUTDOORS FP14088-3 Instrucciones De Montaje página 4

Fogón con cubierta de azulejo de pizarra

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and hardware contents list. If any part is missing or damaged, do
not attempt to assemble the product.
Estimated Assembly Time: 15 minutes
Tools Required for Assembly: Wrench (included), Phillips Screwdriver (not included).
ASSEMBLY INSTRUCTIONS
1.Insert handl e (A) into hole in mesh wire
cover (B). Secure with M6 nut (AA) from
underside of mesh wire cover (B). Then
tighten with wrench (CC).
Hardware Used:
M6 Nut
Wrench
2. Attach left leg (E) and right leg (F) to fire
bowl (D) using M6 nuts (AA) and M6 x 12
mm bolts (BB). Tighten with Phillips
screwdriver (not included). Repeat this step
on the other side. During initial setup, legs
can be adjusted to desired height with 4
options as indicated by line markings. Pull
the knob (1) on the inside of the leg to align
with the hole and release so that it clicks. All
four legs must be adjusted to the same
height.
Hardware Used:
M6 Nuts
M6x12 Bolts
Wrench
1
x 1
x 1
2
x 8
x 4
x 1
4
1
2
1

Publicidad

loading

Este manual también es adecuado para:

Go-201710