Descargar Imprimir esta página

Beko QWIK-PURE 200 Instrucciones De Montaje Y De Uso página 14

Ocultar thumbs Ver también para QWIK-PURE 200:

Publicidad

Installation • Instalación
Installation • Instalação

english
Please check the relevant legal regula-
tions in your country. You should also
contact the public authorities in your area,
since there may be regional variations.
. Area of installation
• Sealed floor or spill basin!
QWIK-PURE 00 =  gallons
QWIK-PURE 0 =  gallons
It is crucial to ensure that untreated
condensate or oil cannot get into the
sewer system in the event of dam-
age.
• The floor area must be stable and level
(max. inclination 1°) to ensure reliable
functioning of the QWIK-PURE.
Oil collector connection
• Place collector on the same floor level
as the QWIK-PURE to ensure oil dis-
charge.
• Firmly screw the oil outlet pipe to the
collector so that oil cannot leak out
(not even in the event of QWIK-PURE
overloading).
2. Inflow
Up to 4 feed points can be connected
directly to the QWIK-PURE.
If there are more than 4 feed points, it will
be necessary to lay a collecting line.
• Ring system along the wall:
- nominal diameter 1" (DN 25)
- above QWIK-PURE inlet (height above
floor)
- slight slope down to the QWIK-PURE
unit (min. 1°)
• Feed in the condensate from the top
into collecting line (swan-neck pipe
bend)
QWIK-PURE 200, 350

Publicidad

loading

Este manual también es adecuado para:

Qwik-pure 350