H-2920, H-2921, H-2922
H-4468, H-4469
MAIL SORTER
TOOLS NEEDED
Phillips Screwdriver
TOOLS NEEDED FOR OPTIONAL WALL MOUNTING
Power Drill
Mail Sorter Unit x 1
Align Vertically
PAGE 1 OF 6
1-800-295-5510
uline.com
3/8" Wrench
1/4" Drill Bit
Rubber Foot x 4
1/2" Bolt x 2
ASSEMBLY
Figure 1
Figure 2
Figure 3
1/16" Drill Bit
PARTS
3/8" Bolt x 2
Nut x 4
1. To prevent sliding or scratching when mounting an
individual rack directly on the floor or on a desk, attach
self-adhesive rubber feet to four bottom corners.
(See Figure 1)
2. When combining modular units to construct a larger
rack, place individual racks on top of each other,
making sure to line up the mounting holes located on
the top and bottom of each unit. (See Figure 2)
NOTE: For H-4468, stack two 15-compartment mail
sorters on top of each other. For H-4469, stack three
15-compartment mail sorters on top of each other.
3. Insert four bolts provided into recessed mounting holes.
Use the 1/2" bolts for the rear holes and the 3/8" bolts for
the front holes. Attach four nuts provided and tighten
securely using Phillips screwdriver and 3/8" wrench.
Repeat this procedure until all racks are connected.
(See Figure 3)
Para Español, vea páginas 3-4.
Pour le français, consulter les pages 5-6.
Screw x3
Drywall Anchor x3
(Included)
(Included)
(Optional)
(Optional)
0421 IH-2920