SHELVING
Step 1
Unpack carton, identify & confirm quantity of components.
Step 2
Insert casters into openings at the bottom of the side panel, see Diagram #1. Make sure that hole in
caster stem is aligned with hole in side panel opening.
Align threaded opening in 1" diameter rod with opening of inside side panel. Thread 2" screw through the
Step 3
side panel opening and into threaded opening of 1" diameter rod and loosely tighten. See Diagram #2.
Make sure screw head is on the the outside of the side panel.
Step 4
Repeat Step 3 for other 1" diameter rod.
Step 5
Insert
/
" diameter rod into inside side panel opening.
3
4
Step 6
Align opening in U-bracket with the opening in the outside of the side panel, see Diagram #3.
Step 7
Thread 1
1
/
" screw through U-bracket and into
8
Repeat steps 5 through 7 for other 3
Step 8
Place side panel on ground with insert rods facing up.
Step 9
Place other side panel on top of side panel on the ground so that rods fit into side panel openings.
Step 10
Insert casters into openings at the bottom of side panel (follow step 2).
Step 11
Step 12
Thread 2" screw through the side panel opening and into threaded opening of 1" diameter rod and
loosely tighten. See Diagram #2.
Step 13
Repeat step 12 for the other caster.
Step 14
Align opening in U-bracket with the opening in the outside of the side panel, see Diagram #3.
Step 15
Thread 1
1
/
" screw through U-bracket and into smaller diameter rod and loosely tighten, see Diagram #4.
8
Repeat steps 14 & 15 for other 3 U-brackets.
Step 16
Stand unit upright and tighten all screws.
Step 17
Part
Side Panels
Qty
2
ASSEMBLY INSTRUCTIONS
Item# FAKDBR20 and FAKDBR12 |
3
/
" diameter rod and loosely tighten, see Diagram #4.
4
3
/
" diameter rods.
4
1" diameter Rods
3
/
" diameter Rods
4
2
Aluminum Bakery Rack
Casters
4
4
1
1
/
" Screws
U-Brackets
2" Screws
8
8
8
4