Descargar Imprimir esta página

Installation Instruction - Orbit WB-2642 Guia De Inicio Rapido

Publicidad

Idiomas disponibles

Idiomas disponibles

Tilt Flat Panel Bracket

Installation instruction

WB2642
Tilting LCD/LED Wall Mount
TV Size:23"-55"
Max Load:55kg
Wall Distance:70mm
VESA: 400X400mm
+/-15°
TILT:
Bubble level systerm Included
Universal Mounting Pattern
IMPORTANT:If you don't understand the right install ways,
please consult to normal installing specialist
Warning Statements
Prior to the installation of this product, the installation instructions should be read and completely
understood. The installation instructions must be read to prevent personal injury and property
damage. Keep theseinstructions in an easily accessible location for future reference.
Recommended mounting surfaces: wooden studs and brick.If the mount is to be installed on
any surface other than wooden studs,use suitable hardware (which is commercially available).
Do not install on a structure that is prone to vibration, movement or chance of impact. Failure
to do so cold result in damage to the display and/or damage to the mounting surface.
Don't install near heater, fireplace, direct sunlight,air conditioning or any other source of direct
heat energy. Failure to do so may result in damage to the display and could increase the risk of
fire.
The maximum loading weight is 99 lbs.Use heavier than that will cause injury.see
apparantus instruction
A secure structure must support the weight or load of the display,When mounting to a wall
that contains wooden studs,dead center of the wooden stud must be confirmed prior to
installation.
At least two qualified people should perform the installation procedure.Injury and/or damage
can result from dropping or mishandling the display.
Hardware kit:
A
(×4) M5×16 screw
B
(×4) M6×16 screw
C
(×4) M8×16 screw
Step1: Wall plate installation
Wood Stud Installation
1
NOTE
:For secure wood stud mounting,the wall plate must be mounted to two studs at
least 16"apart.
Use a high-quality electrnic stud finder (commercially available) to locate two adjacent studs
1
and mark their locations with a pencil.
2
With the help of an assistant, and using the bubble level to ensure the wall plate is level, position the wal
l plate against the wall in the desired mounting location.
3
Mark the right (upper and lower) and the left (upper and lower) positions of the small horizontal slots that are in
alignment with the studs.
4
You should mark four positions total.
5
Next, Pre-drill a 5mm hole 50mm deepth in the wall stud at each marked location.
6
please position the wall plate against the wall and line up the mounting slots with drilled holes
7
For each location, insert a lag bolt and washer(G) into the wall
8
Tighten bolt with an open ended socket wrench by turning clockwise until tight.
D
(×4) M8/M6/M5 Washer
E
(×6) M8 Bolt
(×6) M8 concrete anchor
F
G
(×6) M8 Washer

Publicidad

loading