Before You Start; Power Supply - Seca 769 Manual De Instrucciones Y Garantía

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 42

3. Before you start

Unpacking
– Remove the packaging and place the
scale on a firm, level surface.
The scope of supply includes:
• Weighing platform
• Column with display head
• 2 mounting screws
• Compartment with batteries

Power supply

The scale is generally powered by batter-
ies.
The LC display has a low power consumption – 10,000 weighing operations can be per-
formed with one set of batteries.
– Carefully turn over the scale so that the
base of the scale is accessible.
– Push the battery compartment closure
towards "Battery" and open the cover.
– Connect the cable to the holder and
batteries.
– Place the holder in the battery compart-
ment.
– Close the cover and then turn the scale
back up the right way.
Note: the scale is prepared for use with a seca mains unit which is available as
an accessory.
The connection socket for the mains unit is
in the base of the scale.
Note: the mains unit can also be used
with the batteries in place without the
scale or batteries being damaged.
Model 769
scale from
mains unit
underneath
plug-in
13
GB

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido