ASC2500G/ASC3500G LE
After each process has been performed, a service report is printed.
1. Start by fitting the connections of the AirConServiceCenter to the
vehicle air conditioning system, and opening them.
2. In the basic menu, use the cursor keys or to select "Free
selection":
3. Press ENTER to confirm.
4. Enter the vehicle data and press ENTER to confirm.
8.7.1
Recovery phase
1. Enter the preferred settings and press ENTER to confirm.
2. If "Rec/Recycling phase" has been selected, enter the preferred
waiting time for the pressure increase (standard is 1 min.) in the fol-
lowing menu and press ENTER to confirm, otherwise continue with
chapter "Vacuum process" on page 87.
I
NOTE
The waiting time ensures that any residual refrigerant vaporises and
can then be extracted. The vaporising residual refrigerant triggers an
increase in pressure.
8.7.2
Vacuum process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Vacuum phase" has been selected, enter the preferred vacuum
time (standard is 20 min.), otherwise continue with chapter "Filling
process" on page 88.
3. Use the cursor key to enter the vacuum phase time.
EN
Short selection
Free selection
Other selections
ENTER-OK
Rec/Recycling
phase?
ENTER-OK STOP-EXIT
Pressure increase
Test time
ENTER-OK STOP-EXIT
Vacuum phase
ENTER-OK STOP-EXIT
Yes
No
min.
1
Yes
No
Operation
87