Plumbing Preparation; Install The Waterfall - Kohler K-1002-H2 Guia De Instalacion

Sistema de cascada a la medida
Ocultar thumbs Ver también para K-1002-H2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pump Union

2. Plumbing Preparation

NOTE: Locate the drain overflow so the PVC drain pipe will not exceed 48" (122 cm) in length.
Position the plumbing supplies and drain trap according to the roughing-in dimensions and the
room design. Cap the supplies and check for leaks.

3. Install the Waterfall

Draw pencil lines on both waterfall mounting studs exactly 75" (190.5 cm) above the subfloor. Be
precise with these measurements. You will use these marks to position the waterfall at the correct
height.
Position and level the waterfall between the mounting studs and align the bottom metal flange
edges with the pencil lines. Mark the screw locations on the studs.
Secure the waterfall to the studs with the four drywall screws provided. Tighten securely.
CHECK POINT # 2.
Confirm that:
¤
The plumbing supplies are installed and capped.
¤
The Waterfall bottom edge is positioned exactly 75" (190.5 cm) above the subfloor.
¤
The Waterfall is secured to the studs with four drywall screws.
1030218-2-B
1-1/4" PVC Pipe
Point Up
Align bottom edges of Waterfall
mounting flanges exactly
75"(190.5 cm) above subfloor
Waterfall
Support
Bulkhead Fitting
1-1/2" x 1-1/4" PVC Reducer
Ensure minimum 1/4" (6 mm)
pitch per foot (30.5 cm) from
mounting frame to pump outlet
1-1/4" PVC Tube and Elbows
(Only if Needed)
Tee/Heater Connection
6" (15.2 cm) Tube
14
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-1003-h2

Tabla de contenido