Descargar Imprimir esta página

Ecolab SM Serie Guía De La Instalación página 2

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

1. General information
For safety reasons it is important to read all of the enclosed information
( Installation guide, Service manual, Spare parts, Operating instructions)
before mounting this equipment.. In addition, the legislation in force at the
time of purchase must always be considered in connection with the installa-
tion and mounting of this equipment, no matter the contents of this manual.
If there are matters of dispute please contact your dealer.
This equipment is produced and tested by specially qualifi ed personnel, fol-
lowing approved instructions to ensure our high level of product quality. After
the product is fi nished and tested it is manually inspected with the ultimate
test carried out just before the product is released for shipping. To obtain our
high level of quality and long life we use stainless steel parts. These parts, in
defi ance of our manual inspections may still have some sharp edges, which
can present a cut hazard. Therefore it is advised always to use protective
gloves and show caution when installing the equipment.
2. Preparation
If the wall is made of bricks or concrete, the enclosed screws and rawl plugs
are usable otherwise you have to make sure that the carrying capacity of the
wall is suffi cient.
Note:
The pipeline must be rinsed through before the system is
connected.
See service manual
Note:
Remove cover before the system is mounted on the wall.
3. Placing/application
• The satellite must be placed in frost-free rooms only.
• Free space around the satellite: min 1000 mm.
4. Water supply
SM3
Water volume
30 l/min.
Pressure
12-25 bar
Max. temperature
70
The supply line must be sized so that it can supply the minimum indicated
pressure and water volume when connected to this equipment.
5. Air supply
Air supply for the system is to meet the following specifi cations:
• Pressure
5 – 10 bar
• Consumption
200 Nl/min.
o
C
EN
6. Piping
The pipe system should be made of stainless steel pipes. The pipe joints
should be made in a way that makes separation possible in case of e.g.
repairs, movement or similar.
Pipe connections
Water
Air
Note:
A 1/2" closing valve should be mounted on the water supply
immediately before the satellite and dirt fi lter if any.
7. Assembly
Dimensions see fi g.1
It is recommended to mount the system in an appropriate height (approx. 1,
25 m above the fl oor) on brick or concrete wall. Tighten the satellite with the
enclosed screws and rawl plugs.
SM3
1/2" RG
6 mm

Publicidad

loading

Este manual también es adecuado para:

Sm1pd serie