Descargar Imprimir esta página

Silver King SKF48G/CFRL Manual Técnico Y Lista De Piezas De Repuesto página 11

Publicidad

Idiomas disponibles

Idiomas disponibles

Silver King SKF48G Double-Door Freezer
Sliding Merchandiser Shelf Installation Instructions
The sliding merchandiser shelves are installed with sign channels facing the front of the freezer and with cup channels facing
upward to hold five rows of f'REAL! cups per shelf. The shelves are designed to be installed sloping forward in freezer to cause
rows of cups to slide forward as cups are removed.
1) Identifying Contents of Shelf Kit -
There are six shelves included - three right side and three left side. Right side shelves have two wires sticking out about an extra
inch from their left side, toward the back, and vice versa. The top shelves are identical to the middle shelves, while the two bottom
shelves are shorter, front to back, than the other four shelves. There is also a hardware kit including 16 shelf clips with tangs for
retaining shelves in place, and two double-clip brackets.
2) Preparing to correctly place shelf support clips – THE MOST IMPORTANT STEP!
Correct placement of the clips that support the shelves is critical for proper functioning of the shelves. There are written
instructions below for properly installing the clips as well as a support clip installation drawing on the reverse side of these
instructions. Once you understand the approach, it is easiest to use the drawing on the reverse side to get things right. The written
instructions below will help you get started. For easiest installation, install all sixteen support clips plus the two double-clip brackets
on the pilaster strips as instructed, and then place six shelves onto clips in freezer beginning with the bottom shelves and working up
to the top shelves.
3) Bottom Shelf Support Clip Placement -
The fronts of the bottom shelves rest on the floor of the freezer. The backs of the bottom shelves are supported by support clips on
the pilaster strips on the lower back section of the freezer at a height that puts the tops of these clips closest to 4" up from the freezer
floor.
4) Middle Shelf Support Clip Placement -
The fronts of the middle shelves are supported by one support clip and one double-clip bracket on the pilaster strips on the sides and
center pillar of the freezer at a height that puts the tops of these clips closest to 7 ¼" up from the freezer floor. The double-clip
bracket goes on the pilaster strips on the center pillar of the freezer and supports both the right side and left side shelving. The backs
of the middle shelves are supported by support clips on the pilaster strips on the back of the freezer at a height that puts the tops of
these clips closest to 2" up from the top of the step-out in the back wall of the freezer.
5) Top Shelf Support Clip Placement -
The fronts of the top shelves are supported by one support clip and one double-clip bracket on the pilaster strips on the sides and
center pillar of the freezer at a height that puts the top of these two clips closest to 14 ¼" up from the freezer floor. The double-clip
bracket goes on the pilaster strips on the center pillar of the freezer and supports both the right side and left side shelving. The backs
of the top shelves are supported by support clips on the pilaster strips on the back of the freezer at a height that puts the tops of these
clips closest to 9" up from the top of the step-out in the back wall of the freezer.
6) Shelf Placement -
Insert POS strips into sign channels at front of shelves by sliding them in from the edge. Place backs of bottom (shorter) shelves on
lowest clips on back wall of freezer and rest shelf front on freezer floor. Place middle shelves on next clips up (3 clips and 1 double
clip bracket). Place top shelves on top clips. Shelf installation is complete.
See support clip installation drawing on reverse side.
10

Publicidad

loading