3
Put the upper chimney into lower
chimney. Then pulling out the upper
chimney upwards. Adjust to reach the
height required.
For Tower chimney hood
1
By put the inner chimney into upper
chimney. Then pulling out the upper
chimney upwards. Adjust to reach the
height required.
4
Sliding the chimney to adjust the chimney
height. When the height you required is
reached, then hang the fixing hole to the
fixing screws as showed in picture.
2
Fix the lower chimney with 2 pcs of 4 x
8mm screws.
EN
21