dirna Bergstrom bycool Integral Power Instrucciones De Montaje página 12

Ocultar thumbs Ver también para bycool Integral Power:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 1
INTEGRAL POWER
EN
Position the seal joint, side seals and front
4
seal inside the compact as shown.
a
Seal joint
b
Side seals
c
Front seal
Pass the cabling through the borehole (T)
5
made for this purpose in the roof (figure 1).
Position Integral Power (A) with (6) 13 mm
pieces of bushing, rubber washers and (6)
M6/100x40 screws (B) and nuts M6/100.
Important: Ensure sealtightness between
!
the unit and the ceiling in order to prevent
any water coming in.
Insert rubber washers to prevent water
6A
passage.
Seal the boreholes with silicone.
6B
b
5
A
6A
12
Air conditioning for vehicles
c
B
C
M6/100 nut
flat washer
rubber washer
unit base
bushing
vehicle roof
flat washer
screw M6/100
a
b
5

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

09118600000911980000

Tabla de contenido