Pre-Operation Checks - Sharp CV-10NH Manual De Instalación Y Funcionamiento

Acondicionador de aire para hibitacion tipo portátil
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PRE-OPERATION CHECKS

POWER PLUG CHECK
This air conditioner uses a fused power plug.
Always check the power plug before use.
1
Press the RESET button.
2
Insert the power plug into the wall
socket.
3
Press the TEST button.
You will hear a CLICK if the circuit
breaker is functioning correctly.
4
Press the RESET button until you
hear another CLICK.
The circuit breaker is activated, power
is supplied, and the air conditioner is
now ready for use.
Do not attempt to use the air conditioner if the above procedure
cannot be performed.
Disconnect the power plug and call for service.
LOADING BATTERIES
1
Remove the battery cover at the
back of the remote control.
2
Insert batteries into the com-
partment, making sure the ±
and — polarities are correctly
aligned.
• Lines will appear on the display
when batteries are properly in-
stalled.
3
Reattach the battery cover.
4
Press the RESET button using
a thin pointed implement.
NOTES:
• The battery should last approximately one year under normal use.
• When replacing the batteries, always change both batteries at the same time,
and make sure they are the same type.
• If the remote control does not operate normally after replacing the batteries,
press the RESET button using a thin pointed implement.
• If you will not be using the unit for a prolonged period, remove the batteries from
the remote control.
Use two AAA (R03) batteries.
E-16
RESET
TEST
TEST
RESET
Battery cover

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido