2021-03-25
f� Operating cycle
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
The cycle can be stopped early by pressing the cycle stop button on the control panel.
The press will open automatically within 2 seconds.
10
Press the main switch at the back of the machine to turn the power on.
Set the temperature.
Set the pressing time.
Set the pre-heat duration if necessary.
Adjust the pressure (to suit the type of transfer).
Place the substrate on the lower platen.
Position the transfer sheet correctly.
When the heat platen is at the correct temperature, use the handle to
lower it into position.
The timer will start when the platen is pressed against the substrate.
The press will open automatically when the countdown has finished.
www.sefa.fr