Station assembly
- Remove the cover T of the equipment (Fig. 1).
- Open the equipment and remove the front of the housing (Fig. 2).
- Drill the holes needed for the cable entry glands using the pre-stamped centres on the sides of the housing for
guidance.
- Drill 3 holes on the wall following the fixing holes 1, 2, 3. (Fig. 3).
- Fasten the glands into the equipment.
- Insert the 3 screws and wall plugs through the housing into the holes in the wall and tighten.
- Insert the cables through the glands.
- Fit the front of the housing (Fig.2).
- Connect the battery before closing the cover.
- Insert and tighten screws D, F (Fig. 1).
- Connect the cables as shown in the wiring diagram, close the cover T, insert and tighten screws A, C (Fig. 1).
FIG. 1
Button assembly
The button should be installed inside the coldroom, in a visible place and no higher than 125 cm from
the floor.
-Remove the button's cover (Fig. 4).
-Drill the hole for the included gland needed for the cable entry following the pre-stamped centres on the bottom
of the base.
-Drill 3 holes on the wall following the fixing holes. (Fig. 5).
-Fasten the gland onto the base.
-Insert the 3 screws+plugs through the base, into the 3 holes on the wall and tighten.
-Insert the cables into the gland and connect them according to the wiring diagram.
-Insert the cover and gently press it until you hear a "click".
FIG. 4
Press gently
Fixing holes suitable for
universal built-in housing
FIG. 2
FIG. 5
Max. Ø 3,7
35
18
222,1 mm
140 mm
FIG. 3
Fixing hole detail
125,5
171