Ingersoll Rand ENL 10 Instruciones De Instalación Y De Servicio página 9

Ocultar thumbs Ver también para ENL 10:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3847892
4. CONTROL ANd mAINTENANCE
Installation of the control unit on the ENL 10 Service unit:
1.
2.
3.
4.
Start-up subsequent to maintenance measures:
Always carry out prior to the start-up:
ingersollrandproducts.com
Check whether or not the service unit with contact
springs (28) are clean, dry, and free from impurities.
Introduce the sensor (5) into the service unit (9).
Hang the hook (29) of the control unit (1...8) in the
service unit (9).
Press the control unit (1...8) against the service unit (9),
snap into place and make sure it is securely mounted.
Leak test of the screwed connector of the condensate
receiver tank and of the connection of this tank to the
service unit
Check of the electrical connections
Check of the correct engagement of the control unit
EN
9

Publicidad

Tabla de contenido
loading

Tabla de contenido