ASSEMBLY INSTRUCTIONS
4. Attach propane tank strap (N) to bottom plate (L).
5. Bracket Post Installation.
5-1. Attach four bracket posts (F, G, H, I) to the bottom
plate with four M6 X 30 bolts (BB). Make sure to
keep front brackets in front and back brackets in
back. The tank hole on the bottom plate should be
in the front as pictured.
Hardware Used
BB
Bolt M6 X 30
GG
Wrench
5-2. After assembly, attach the bracket posts (G, H)
and gas cylinder block belt (K) with two M6 X 12
bolts (DD).
Hardware Used
DD
Bolt M6 X 12
FF
Phillips screwdriver
4
5-1
G
X 4
X 1
5-2
X 2
X 1
H
DD
10
N
BB
F
G
K
L
H
I
G