Installing Panels - Novoferm NovoDock L730i Manual De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

11.1
Instruction
· The separately supplied top panel is pushed into the construction under the telescoping lip and aligned.
* The front projection of the panel must be adapted to the situation at the site.
The projection specified by the factory is 150 mm.
· The panel is attached from the underside using 2 self-drilling 6,3 x 25 mm screws on each side.
General instruction: The image may differ at detail level.
11.2
This installation manual must be given to the customer and kept safely during the entire period of use!

11. Installing panels

Instruction
The pre-assembled front panel is slid into the side guide on the
leveller platform and attached on each side using an M10 x 70
bolt and a 6.3 x 25 mm self-drilling screw.
General instruction: The image may differ at detail level.
EN
15

Publicidad

Tabla de contenido
loading

Tabla de contenido