Premier SOL-5532 Manual De Instrucciones página 12

Sistema de energía solar
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8. Don't use chemicals on solar panels when cleaning.
9. Product should be installed and maintained by qualified personal. Keep unauthorized person away
from the host and cable.
10. Avoid shadowing cells in order to prevent solar module hot spots or reduction in power.
11. For more information, contact the technical support.
12. When you charge the battery only, make the breaker on. When you load the AC power, both the
breaker and AC power switch should be on.
2 points to be check before installation:
1.Unpacking and checking parts
When you unpack the system, check the parts list.
2.Tools you will need.
Grounding wire, Screwdriver set, Spanner,Bracket, Gloves, Digital multi-meter.

Publicidad

Tabla de contenido
loading

Tabla de contenido