Maintenance And Service - EAS ELECTRIC E190WHF Manual De Instrucciones

Acumulador aerotérmico acs
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

E. Maintenance and service
Examination before trial run
1. Check the water tank is filled with water, and open the water outlet tap till water flow out.
2. Check the water pressure is normal (0.15Mpa~0.7Mpa).
3. Check the air inlet or outlet is well connected; and the air outlet pipe heat insulation is completed.
4. Check the power supply voltage is normal, whether according with the nameplate requirement.
(Range ± 10%).
5. Check whether the equipped parts are screwed /locked well.
6. Check whether the wirings are according with the Circuit diagram, and the earth-wire is
connected.
7. Check whether the wind inlet and outlet has been cleaned up and no obstacle.
8. Check whether the condensate drain pipe is connected well and no blockage.
9. After power-ON, check the control panel display is normal.
Trial running
1. After the machine starts, to hear and determine whether there is abnormal sound or collision
during operation, if there is abnormal sound, stop the unit immediately and check for it until there
is no abnormal sound to continue operation.
2. For the first time power on, the compressor will have 3 minutes delay protection function.
3. Observe whether the drainage of condensate water is smooth, prevent the chassis stagnant or
spill water.
4. For the first time discharge hot water or start the units after a long time closure, the water tap of
outlet pipe may flow muddy water, this is a normal phenomenon, and continue to drain for a period
of time can be cleared.
5. After stop operation for a long time, there may have condensation water hereabout the air outlet or
pipe (especial in humidity weather), this is a normal phenomenon, use a dry washcloth to clean it
or by air dry.
6. The advance setting parameters of the operation panel has been set at the factory, users no need
to reset it, the maintenance person should be carefully set if needed.

Maintenance and service

1. After carry and move the unit by the first time installation, and connects the water pipes and filled
the tank with water. The machine should be rest for 1-2 hours before start trial running.
2. The water heater inlet filter needs to be cleaned once per 3 months. At the same time, per half
year we suggest draining all the storage water and repeatedly wash for 2-3 times to remove the
dirt and sediment.
3. To keep the unit in good heating performance, suggest cleaning the Air inlet /outlet filter net per
month, or using high pressure air tube to clean the Heat exchanger. Be careful not to damage the
copper tube.
4. Clean the Electric Heater per 6 months. (When clean the Electric Heater or Heat Exchanger must
cut off power supply.)
5. Change the Anode (Magnesium rod) per 6 months for better anticorrosion and antiscale.
According to different water quality, change the Anode rod when it's expended.
6. When clean the Tank, Electric Heater, Heat Exchanger or Anode rod must cut off power supply.
7. If the supply cord is damaged, it must be replaced by the manufacturer or its service agent or a
similarly qualified person.
8. Special statement: for what does not in accordance with the requirements of above maintenance
and service work lead to the failure problem, does not apply to our warranty scope.
11
V.3

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido