Step 5
To lift and hood body by 2 persons to
near the opened hole in the ceiling,the
third person insert power plug into the
power socket which is prepared firstly.
Step 7
Lift the guide panel to the body of hood
by 2 persons,connect wire of switch and
LED light,then adjust the screw holes in
guide panel to be aligned with the nuts
on range hood body,then fix 6 screws
tightly.
Step 6
Lift the hood into the hole opened
before,then adjust the screw of 4
bayonets until the hood body is aligned
with the ceiling, make sure 4 bayonets to
get stuck the wood frame installed inside
of ceiling at same time,and make sure not
loose from all sides.
Step 8
Close the guide panel then installation is
finished,turn on switch by remote control
as instruction on the user manual.
EN
29