8. Drying times average
FILLER
PRIMER
PAINTS
SOLVENTS
NOTE: These are approximate average times. The product thickness, temperature and % humidity
can vary the drying time of the aforementioned products.
9. Maintenance
In order to keep the drier in optimal working condition, it is necessary to regularly:
ALL EXAMINATION, MAINTENANCE CHANGING OF LAMP OR REPAIRS MUST BE REALIZED
ONLY AFTER HAVING DISCONNECTED THE MACHINE FROM THE MAIN POWER SUPPLY
- Clean the lamps and reflectors with a dry cloth. Do not use abrasive or aggressive products
(solvents, abrasives...). Do not clean while the lamps are hot.
- Avoid all contact between products and the heating modules.
- Lubricate all pivot points.
Light Tube Replacement
a) Prepare the cassette which needs
replacement.
b) Remove the grille of cassette.
c) Remove the plates from both ends of the
cassette.
d) Remove the fixed plates from both ends
of the cassette.
e) Loosen fixed screws and cut off
connections, the light tube can be replaced.
f) Repeat the steps above in reverse order to
replace the light tube.
PRE-DRYING
COMPLET DRYING
TIME
TIME
-
10 min.
4 - 6 min.
8 - 10 min.
4 - 6 min.
8 - 10 min.
6 min.
8 - 12 min.
ENGLISH
DISTANCE
50 - 60 cm.
60 - 70 cm.
>70 cm.
>70 cm.
c)
b)
d)