NetSpa NOVARDEN NSI50 Guía De Instalación Y Utilización página 25

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

The number of persons required for installation: 1 adult at least.
3.3. Assembling
1) Unfold the inflatable spa over the
base protector.
4) Insert the inflation hose into the
inflatable spa
7) Remove the inflation hose and
screw the cap firmly in place.
10) Ensure that the drain caps are
properly closed before before filling
the spa
Warling : Do not leave spa unattended while filling with water.
Make sure the drain fitting is plugged securely and the cap is in place. Start filling the spa with water. After
about 1-inch of water is on the bottom, stop filling and smooth wrinkles out of the bottom of the spa. Pull
the outer wall out from the top edge, all around the bottom of the spa, so that it fills evently.
15 minutes for site preparation and water filling.
2) Bring the pump unit to the inflatable
spa.
5) Connect the pump unit then press
the button
The air flow valve prevents your spa
from over-inflating.
8) Connect the unit pump to the pool
using the 3 connectors to screw.
Ensure the icons on the pump and the
pool match up
11) Fill the spa with 10 cm of water.
Continue filling the spa until waterf level.
to inflate the spa.
3) Connect the inflation hose to the
pump on the socket
.
6) Inflate the inflatable spa for about
10 minutes. Ensure that the spa is
firmly inflated.
9) Put the sock on the filter cartridge
then screw it onto the lower suction
inside the basin.
12) Smooth wrinkles out of the bottom
of the spa, then fill the spa to the level
indicated. Your spa is ready.
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido