GE AEQ24 Serie Manual Del Propietario Y Instrucciones De Instalación página 10

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARE THE AIR CONDITIONER
3
(continues)
Remove the shipping screws located on
E
the top of the case.
Remove the ground screws from each
F
side of the case. Keep it in a safe location.
NOTE: Be sure to save this screw. You will need
them later in the installation.
Slide the air conditioner from the case by
G
gripping the base pan handle and pulling
forward while bracing the case. Do not
pull or lift on the styrofoam discharge area.
H
Your unit may come with internal
packaging. This packaging must be
removed prior to installing the air
conditioner back into the cabinet.
Installation Instructions
Installation Instructions
4
A
B
C
Do not
pull
or lift
in this
area—
damage
to the
unit may
result
FRONT
D
Bottom mounting rail
10
PREPARE THE CASE
Attach the top rail gasket to the bottom
of the top rail.
Install the top mounting rail with 4 type A
screws from the inside of the case. Press
firmly to drive the screws into the gasket
and through the top mounting rail.
Top mounting rail
Slide each side retainer onto the edge of
each according panel. The figure shows
the orientation of each accordion panel
and side retainer assembly relative to the
case from a top view of the unit.
SIDE RETAINER
WINDOW FILLER PANEL
SIDE RETAINER
WINDOW FILLER PANEL
Slide the left and right accordion panels
into the top and bottom mounting rails.
Top left
Top right

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Aeq25 serie

Tabla de contenido