Maintenance Schedule - VITO PRO-POWER VICSOS6 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MAINTENANCE SCHEDULE

Action
Clean the motor and check if all
screws
and
nuts
tightened
Check the safety and non-return
valves
Check the condition of pipes,
hoses,
couplings,
accessories and possible air leaks
Check the condition of the air
receiver tank
Drain out the air tank
Check the air filter
Clean air filter
Replace the filtering element
Verificar
from the air filter
Check and replacement of safety
and check valves
(1) Perform frequent maintenance works when the equipment is used in dusty areas.
(2) These items should be serviced by the service dealer unless you have the appropriate tools and mechanical
knowledge.
40
1st month
are
well

connection




Every 3
months or
or 20
after 100
hours
hours
(1)
Every year or
Every 6 months
after 1000
or 500 hours

hours
(2)

Publicidad

Tabla de contenido
loading

Tabla de contenido