SE1
SE2
SE3
18
(1)
English
6. Set up
■ CONNECTING SWITCH WIRES
• Connect the switch wires between the engine and
the main unit. Pair the wires of the same color.
■ INSTALLING HANDLE
• Mount the handle to the shaft tube and clamp it at a
location that is comfortable to you. (SE1)
(1) About 11 inches (28cm)
■ INSTALLING DEBRIS GUARD
• Put the debris guard on the gear box, attach it with
the screws and hardware provided. (SE2)
■ INSTALLING CUTTING HEAD (SE3)
1. While locking the gear shaft, by inserting the
supplied tool into the upper holder on the gear box,
loosen and remove the hexagon nut(left-handed)
2. Fit the line head assembly to the gear shaft over the
holders. Hand-tighten it securely.
IMPORTANT
You need not holder (B) and nut when installing the
cutting head.