Descargar Imprimir esta página

GE ZV30H Instrucciones De Instalación página 9

Campana montada en pared de 30”
Ocultar thumbs Ver también para ZV30H:

Publicidad

Idiomas disponibles

Idiomas disponibles

Vent Mode
Installation Preparation
Z
Y
R=3 1/2" (Optional)
B=10 1/2"
C=Ceiling
Height
X=24" Min, 36" Max
A
NOTE: Installation height should be measured from
-
the cooking surface to the bottom of the hood. The
vent hood must be installed 24" min. and 36" max.
above the cooking surface. The hood installation
height, from the cooking surface to the bottom of the
hood, depends upon ceiling height and other factors
which must be considered .
9
Z=0
Y
B=10 1/2"
C=Ceiling
X=24" Min, 36" Max
A
Height

Publicidad

loading