Descargar Imprimir esta página

Twin-Star International 36WM1512 Manual De Instrucciones Adjunto página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Insert one Wood Dowel (CC) into each of the
pre-drilled holes on the top edges of the Assembly
from step 4. Then locate Mantel/Top (G) and lay
fi nished side up on top of completed assembly.
From the inside, attach Mantel/Top (G) using Bolts
(AA) and Washers (BB) through the pre-drilled holes
in the mounting blocks.
HAND TIGHTEN ONLY.
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
7. Insert one Wood Dowel (CC) into each of the
pre-drilled holes, then attach the Connect Block (I)
to the front panel, using Bolts (AA) and Washers
(BB) through the pre-drilled holes.
HAND TIGHTEN ONLY.
Using Phillips head screwdriver tighten all Bolts
alternating top and bottom, left and right.
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
8. MOVE YOUR COMPLETED UNIT ONLY SHORT
DISTANCES. MOVE COMPLETED UNIT WITH
GREAT CARE. IT TAKES TWO PEOPLE TO MOVE
COMPLETED UNIT INTO ITS FINAL POSITION.
To secure the completed Mantel to the wall tighten
screw (DD) through the Metal "L" Bracket into the
wall. It is recommended that you use wall anchors
when not screwing into wall studs.
Hardware Used
DD
Screw ø4*50mm
HH
Wall Anchor
Fig. 6
x 7
x 7
x 8
Fig. 7
x 4
I
x 4
x 4
Fig. 8
WALL
x 2
x 2
6
G
CC
BB
AA
CC
BB
AA
HH
DD
EE
I

Publicidad

loading