TP3 COND 65 ÷ 1000
4.4 Identification
The boiler can be identified by means of:
• Bag with documents
It is applied on the door and contains:
TECHNICAL MANUAL
WARRANTY CERTIFICATE
LABELS WITH BAR CODE
DATA PLATE
CONSTRUCTION CERTIFICATE (hydraulic test passed)
5.
InSTallaTIon
5.1 Packing
TP3 COND boilers are supplied inside wooden packing, complete with door, smoke chamber, insulation on the body and casing.
The instrument panel is supplied according to the equipment chosen by the user.
5.2 handling
TP3 COND boilers have lifting hooks "a" (see Fig. 3 and Fig. 4). Be careful during handling, and use equipment suitable for the weight.
Before positioning the boiler, remove the wooden base by undoing the fixing screws (Fig. 5).
fig. 3 - from model TP3 cond 65 to TP3 cond 230
A
A
fig. 5 - Positioning
cod. 3541T740 - Rev. 04 - 10/2019
• daTa PlaTe
It gives the technical data and performance of the unit.
It is APPLIED in a visible place at the top of one of the casing
side panels.
If lost, ask the FERROLI After-Sales Service for a duplicate.
Tampering, removal or lack of the identification plate prevents
sure identification of the product, and makes any installation and
maintenance operation difficult.
A
fig. 4 - from model TP3 cond 370 to TP3 cond 1000
EN
59