Descargar Imprimir esta página

VMB TE-064 Manual De Instrucciones página 10

Torre elevadora
Ocultar thumbs Ver también para TE-064:

Publicidad

Idiomas disponibles

Idiomas disponibles

Operating instructions
3. SAFTEY PRECAUTIONS
3.1 - Place the tower only in strong and level
surfaces.
3.2 - Verify that the legs are inserted and tightly
fastened by the safety catches (R).
3.3 - Verify that the tower is in a vertical
position by means of the spirit level (F) placed
in the main section. Adjust, if necessary, with
the disc feet supports (Q), rotating the hand
crank (H).
3.4 - Verify that the elevator tower is blocked
in the working position by means of the safety
catches (M1, M2, M3).
3.5 - To use the tower in the open air, place the
tower in terra firma and protect it against the
wind action.
3.6 - Do not use stairways neither over the
tower nor leaned in it.
3.7 - Be careful with cables, prominent objects,
etc. placed above the tower.
3.8 - Do not stay under the load.
3.9 - Do not move the tower when it is lifted with
load.
3.10 - Before any use of the tower verify the
cable, this must be free of cuts and fraying.
Do not use cables in bad conditions.
3.11 - Never take to pieces the hand crank of
the winch (W) if the tower is lifted with load.
3.12 - The minimum load required for a perfect
braking function is 25 Kg. The brake will not
function without this minimum load.
3.13 - Do not apply oil or grease to the brake
mechanism.
ENGLISH
3.14 - Not approved for lifting persons.
3.15 - For the transport, lower all the sections
and blockade them with their safety catches.
4. OPERATION
4.1 - In order to place the elevator tower in
their working location, put the tower leaned in
their transport wheels (T) on a hard and level
surface.
4.2 - Get out the legs (P) of their support for the
transport (S) and insert them in their working
lodging (V) verifying that they are tightly
fastened by the safety catches (R).
4.3 - Adjust the vertical position of the tower by
means of the disc feet supports (Q) rotating
the hand crank (H) in the necessary direction
to manage that the bubble of the spirit level (F)
stays centred in the circle.
4.4 - Put the load on top of the tower using the
suitable support, in order to make work the
weight of the load only in the vertical direction.
The minimum load must be 25 Kg.
4.5 - Lifting:
Elevate the tower rotating the hand crank
of the winch (W) clockwise (N
up to desired height.
www.audiovias.com
-
), lifting the load
1

Publicidad

loading