www.franke.com
Once completed, proceed with cleaning the holes and placing the remaining four Ø10 mm nylon plugs.
Put the changing station back on the top two screws and fix the structure to the wall with the four Ø6.3x70
mm screws and the four DIN125 M8 washers of the lower holes, then fully tighten the top two screws, the
distribution of the components is shown in the following figure:
Make sure that the six screws securing the unit to the wall have been properly tightened and that the
changing station is firmly fixed to the wall.
Installation on plasterboard or hollow wall.
The fixing systems supplied with this changing station are not suitable for installation on
plasterboard or hollow walls.
In order to install the unit on this type of wall, fastening anchors and tools specific for plasterboard or
hollow walls must be used.
Due to the problems posed by installations on this type of walls, with regard to fixing, it is recommended
that the installation is carried out by technicians specialized in installations on this type of walls. The
manufacturer is not responsible for the installation of its changing stations on plasterboard or hollow walls.
Step 4. Mounting the liner dispenser on the changing station holding
structure
Take the liner dispenser and, after verifying that it is not damaged or scratched, place it on the metal
structure following the sequence of steps shown below and thus ensuring its proper position with the metal
shafts.
-15-