Viesta DW70 Manual De Instrucciones página 4

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 30
Step 1:
Place the aluminum profile on the wall, align the profile, as shown in the picture below, using a spirit level and
mark the drill holes with a pencil.
Drill the holes in the wall with a 8mm drill.
Note: If you pre-drill the holes with a 2mm drill, you will not slip so easily
Press the dowels into the holes.
If the dowels are difficult to push into the holes, please use a rubber hammer.
Insert the screws through the aluminum profile and screw them into the dowels.
Before tightening the screws, align the rail again with the spirit level.
1.
INSTALLATION
[ EN ● 4 ]
Version: 1.0
KEN001DW 21.07.2017
Ø 8mm
C
B
2.
3.
4.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dw90Dw120

Tabla de contenido