Technibel Climatisation CAFM255R5IA Manual Del Usuario página 12

Ocultar thumbs Ver también para CAFM255R5IA:
Tabla de contenido

Publicidad

(e) Installing the ceiling panel
Attach the ceiling panel to the chamber.
Drawing the panel downwards sets the panel in
position temporarily with the panel catch (at 2
locations).
Remove the socket cover of the air-intake plenum
and pass the 8P sockets through it. (Fix the panel
lead wire to chamber side clamper.) (Fig. 2-17)
Connect the 8P socket (electrical component box
side) to the 8P socket (ceiling panel side) of the
indoor unit electrical component box.
Reattach the socket cover.
Duct
connection
flange
Installation screws
(M4 × 12)
Panel catch
Ceiling panel
12
Duct connection box
Fig. 2-18
2265_X_S

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cafm365r5iaCafm485r5ia

Tabla de contenido