ViewSonic LD-STND-002 Guia De Inicio Rapido página 6

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 67
Connecting the System Control Box to the Floor Base
1. Carefully unfold the System Control Box panel. Ensure the main system control board
is on the left.
NOTE: 
Use caution as the System Control Box panel is separated into two pieces with
wires attached.
2. Align the System Control Box to the eight (8) holes on the Bottom Cross Beam and
secure it with eight (8) M6x10mm screws.
3. Install two (2) additional screws (M6x10mm) to connect the two halves of the System
Control Box.
NOTE: 
Screws (M6x10mm) are placed in the accessory box of the LED Display.
6

Publicidad

Tabla de contenido
loading

Tabla de contenido