Commissioning - Bosch Rexroth SE311 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 28
3 609 929 983/1.0 | SE311

5 Commissioning

5
Commissioning
Before commissioning, the proper seat of all
jumpers must be ensured. For
commissioning, proceed as follows:
1 Remove the isolating strips between the
holder and the battery, and check to see if
the battery is properly inserted in the
battery holder. If not, insert a battery
according to the instructions in section 4.1.
2 Insert the SE311 into the system box or
BT300.
3 Turn on the voltage supply for the system
box or card rack.
4 Connect the operating computer and set
the time with the BS300 system if
operated without a KE.
5 Configure the interfaces and program the
tightening system.
5.1
Display elements
Two LEDs are installed on the front panel of
the SE311 tightening controller which
indicate the operating states:
LED
Green
Ready for operation
Red flashing
System error
Green flashing
Nutrunner in bypass
Nutrunner in sequence
test
Figure 3:
Electric Drives and Controls | Bosch Rexroth AG 13 /40
LED
Green
Tightening
result OK
Red flashing
Tightening
result NOK
5.2
Interface X 6: RS232
This interface is intended to connect a
programming device or an SD301.
1
5
6
9
Figure 4: Sub-D plug, 9-pin
Pin
Signal Description/
Function
1
-
2
RxD
RS232 Receive
3
TxD
RS232 Send
4
24 V
24 V Power
supply for SD301
5
GND
Reference
Potential Logic
6
-
7
RTS
RS232 Request
Send
8
CTS
RS232 Enable
Send
9
-
Table 3:
Voltage/
Current/
Standard
–12 V...+12 V,
RS232
–12 V...+12 V,
RS232
24 V=,
300 mA
–12 V...+12 V,
RS232
–12 V...+12 V,
RS232

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Se311 3 609 929 983

Tabla de contenido