PREPARING THE WINDOW FOR
5
INSTALLATION
Measure the width of the window opening and
A
mark the center line on the inside windowsill.
Center line
Install the window lock bracket behind the
B
inner windowsill, with the short side of window
lock. Use 2 type B screws provided.
The window lock bracket helps hold unit
securely in place. Be sure to place window
lock bracket edge flush against back or inner
sill.
Type B screws
Inner sill
Outer sill
7.5"
Short side
7.5"
Remove backing on bottom seal. Place seal,
C
adhesive side down, on the bottom of the air
conditioner behind the bottom mounting rail.
Front
Installation Instructions
Window lock
brackets
Center line
Bottom Seal
Bottom
mounting rail
9
INSTALL THE AIR CONDITIONER
6
IN THE WINDOW
A
Set the air conditioner in the window so that
is centered. Place the air conditioner so that
front edge of the bottom mounting rail is
against the back edge of the sill.
Window frame
Top channel
Bottom guide
Window lock
bracket
Bring the window down so that the front
B
edge of the top mounting is in front of the
window. Make sure that that air conditioner
is level or tilting slightly to the outside.
Type B screws
C
Extend the curtain panels until they fill the
window. Mark the location of the holes in
each corner. Use the drill and 1/8" drill bit to
drill pilot holes. Use 4 type B screws to to
secure the side panels in place.
About 1/4"