H-5101
SHOWER EYEWASH STATION
1. Assemble the floor flange (A), 1⁄" IPS x 6⁄" nipple (B)
and plugged outlet tee (C).
IMPORTANT! Plugged outlet tee (C) must be
oriented with plugged end down to assure
proper drainage.
2. Assemble 1⁄" IPS x 16⁄" nipple (D) and frame
assembly (E). Position frame assembly for proper
access by users.
3. Assemble 1⁄" IPS x 32" nipple (F) and inlet tee (G).
Position tee for connection to supply. If the top
vertical inlet will be employed, plug tee (G) with
supplied 1⁄" IPS square head plug.
4. Assemble 1⁄" IPS x 22" nipple (H) and 1⁄ x 1" IPS
reducing inlet tee (I). Position tee forward for proper
location of shower. If the back horizontal inlet will be
employed, plug tee (I) with supplied 1⁄" IPS square
head plug.
5. Assemble 1⁄" IPS x 8⁄" nipple (J) emergency shower
valve (K), 1" IPS x 10⁄" nipple (L), elbow (M) and
shower head (N).
6. Place cupped washer (O), rubber gasket (P) and
bowl (Q) onto waste receptor. Center components to
assure a watertight seal.
7. Thread drain plate (R) down onto mounting shank as
far as possible. If necessary, rotate bowl clockwise
to draw drain plate down onto mounting shank.
8. Thread spray head assembly (S) onto mounting
shank. Position outlet heads for proper access
by user.
9. Secure entire unit to floor and/or wall for stability.
10. Attach orange plastic paper wrap and sign.
NOTE: All threads are tapered pipe and require
pipe joint compound or thread sealing tape to
assure watertight connection.
NOTE: Test the entire unit for proper operation.
NOTE: The use of dielectric unions is required
when connecting to copper supply to avoid
premature corrosion.
PAGE 1 OF 3
1-800-295-5510
uline.com
ASSEMBLY
N
Para Español, vea página 2.
Pour le français, consulter la page 3.
J
K
L
M
S
R
Q
P
O
I
H
G
F
E
D
C
B
A
0421 IH-5101