New Construction Assembly Instructions - Hoover 7122-01 Manual Del Usuario

Baño del ventilador con luz
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
CAUTION: MAKE SURE POWER IS SWITCHED OFF AT SERVICE PANEL BEFORE STARTING
INSTALLATION.
INSTALLATION IN NEW CONSTRUCTION
1.
Select the location for the fan in the ceiling. Position housing
mounting tabs against joist so that bottom edge of housing is
flush with ceiling board. Do not flush mount to joist.
Mark the joist at the keyhole slot of both mounting tabs.
2.
Put housing on the side and drive nails part way into joist at
the top of keyhole marks.
3.
Hang housing from nails and pound nails into joist. For a quieter
mount, hammer another nail through the additional hole of each
mounting tab.
INSTALLING DUCT WORK
4.
Snap the duct connector onto housing. Tabs on the connector
need to lock into slots in housing.
Top of duct connector should be flush with top of housing.
5.
Connect circular duct to connector with duct tape (not supplied)
or clamps (not supplied) and extend duct to outside.
6
1
2
3
4
5
www.homewerksww.com

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido