Before starting the assembly, make sure that you have all the necessary parts by taking an inventory starting from
the parts list provided on page 9.
• Installation on concrete slab is mandatory and imperative for warranty validation. Thickness: 10 cm minimum.
Make sure that the slab is perfectly flat, smooth and level.
SUMMARY:
– Preparation of the concrete slab
– Wall assembly
– Bracket screwing
– Mounting wall reinforcements
– Preparation of the walls
– Felt and liner installation
– Nozzles and skimmer cutting
– Mounting the pine coping stones
9
– Ladders
3a – Draw the locations of the pre-drilling on the 7 solid walls.
3b – Draw the locations of the pre-drilling on the skimmer wall.
3c – Positioning of the brackets in the up – down direction. Adapt the brackets and screw them until the screw heads are embedded in the wood.
3d – Level the brackets and screw them until the screw heads are embedded in the wood.
3e – Attach the wooden stops for the skimmer flap
4a – Cut the 45x135 section pole to length for the skimmer.
4b – Cut the 45x135 section wall reinforcement posts at the pool level
4c – Mark the location of the holes and drill the walls.
4d – Screw all beams to the wall reinforcement and embed the screw heads in the wood.
5a – Screw the skimmer vent into the upper beam using 2 round head screws to be removed from the screw bag provided in the skimmer box.
5b – Install the skimmer square outer seal and the skimmer body.
5c – Fix the assembly with the 8 round head screws to be removed from the screw bag provided in the skimmer box, tightening effectively for a good seal.
5d – After covering the Teflon threaded part, screw the threaded stop valve into the skimmer body. If the reinforcement post hinders its positioning, provide
a cut-out to free up the necessary space. Close the valve.
5e – Drill the rails to size (3 cm from the ends and then every 20 cm approximately). The rail of a wall can be composed of several segments placed end to end.
Before the next step, carefully clean the concrete slab and remove shards or splinters from the walls with abrasive paper in order to make all
supports clean and smooth.
5f – Unwind the wall felt and place the plastic rail on top flush with the upper beam.
5g – Screw on the first rail liner.
5h – Draw the angle to be cut.
5i – Cut the corners according to the diagram. Screw all rails together.
5j – Find the skimmer frame by trial and error.
5k – Cut the felt outside the frame.
5l – Proceed in the same way with the discharge.
5m – Seals. Place a rectangular joint on the skimmer frame, making sure it adheres well. At the outlet, install the cork seal (A) at the contact with the wall and then
superimpose one of the 2 white round joints (B), making sure that they adhere well.
6a – Install the protective felt for the floor.
6b – Cut the protective felt with a cutter or a pair of scissors.
6c – Place the liner in place at an outside temperature between 20 and 25°C.
6d – Match the corners of the liner with the bottom corners of the pool.
6e – Hang the liner in the lip of the rail.
6f – Monitor the positioning of the liner and remove the coarser folds.
6g – Adjust the angles of the liner with those of the structure.
6h – Put in 2 cm of water.
6i – Remove folds.
6j – Fill up to 5 cm below the discharge nozzle.
7a – Stop the impoundment 5 cm below the discharge nozzle.
7b – Position the discharge nozzle from inside the pool.
7c – Cut the liner at the nozzle, leaving a gap of around 2 mm. Insert the white gasket (B) and the discharge nozzle.
7d – Tighten the outer nut of the nozzle to ensure tightness by means, if necessary, of the tip mentioned in the diagram.
7e – Cover the threaded part of the end caps with Teflon tape in a counter-clockwise direction. Minimum 20 revolutions.
7f – Screw one end cap to the discharge and the other below the skimmer valve.
7g – Install one of the pipes at the outlet and secure it with a metal clamp.
7h – Place the other end of the pipe in the pool and refill up to 5 cm below the skimmer.
7i – Mark the location of the skimmer joint.
7j – Install the seal and skimmer frame using the 18 flat head screws to be removed from the screw bag provided in the skimmer box.
7k – Cut the liner inside the skimmer frame. Finally, place the flange cover by clipping it into place.
7l – Correct water level at mid-height of the skimmer (after setting up the filtration).
7m – Cut the finishing profiles to pool height and fix them with the nails provided, leaving a gap of 2 cm between the end of the profile and the finishing of the
coping stone.
8
• (see page 28)
9
9a – Retrofit the ladder. To do this, flush the air below the steps if necessary.
9b – Attach the stainless steel supports using the bolts provided in the stainless steel ladder box. Set up the stainless steel ladder.
If using a safety tarp, remember to centre the stainless steel ladder on the coping stone.
1a - Mark the positioning of the structure on the ground with a margin of 50 cm to facilitate the control of the
geometry.
1b - For a concrete slab to the size specified on page 10, with a minimum thickness of 10 cm.
1c - Align the pool so as to position the skimmer entrance facing the prevailing winds in order to optimise the
removal of particles from the surface. For this purpose, use the first row of beams temporarily.
2* - IMPORTANT: It is important that the beams are properly nested, especially those at the bottom (where
the water pressure will be highest). TO INTERLOCK A WARPED BEAM: Even when packed on pallets,
it is possible that some beams may be warped. This is quite normal, since wood is a living material. To
mount a warped beam, position and snap one side of the beam on both sides. Straighten up the other
side with 2 wooden shims and the attached clamp. Engage it with the mass and the martyr piece.
2a – Assembly principle. Use the martyr piece to interlock all the beams. The tabs are intended to correctly align
the beams when they are interlocked, missing or broken small sizes do not in any way affect the mechanical
resistance of the wood, the strength and assembly of the swimming pool.
2b – Retrofit the first row of beams.
2c – Check the geometry with a tape measure (10 m) and continue assembling the beams until the 5th full row.
2d – Check the geometry using a tape measure (10m).
2e – Position the delivery beam in the 6th row. It can be placed on the right or left of the skimmer.
2f – Position the lower skimmer beam in the 7th row after the lower half beam.
2g – Position the upper skimmer beam and the 3 upper beams.
16 42