Recommissioning The Inverter - SMA NR-STP-PVS Instrucciones Para La Sustitución

Para sunny tripower 8000tl; sunny tripower 10000tl; sunny tripower 12000tl; sunny tripower 15000tl; sunny tripower 17000tl
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 81

8 Recommissioning the Inverter

• Push the fan into the mounting rails of the fan
bracket and hook into place below the locking
tabs. When doing so, ensure that the arrow on
the fan is pointing to the left (pointing away
from the bracket). The airflow is thereby
aligned correctly.
• Plug the fan cable plug into the terminal for the
fan cable.
4. Connect the cables:
• Plug the assembly cables of the EMC filtering
device into the openings of the corresponding
terminals of the PVS assembly. When doing so,
ensure that the color assignment is correct.
Depending on the device version, the cables
are determined either by the color marking
above the bootlace ferrules or by the color of
the cable sheath.
• Plug the ribbon cable plug into the PVS assembly and close the ferrite terminal.
5. Recommission the inverter (see Section 8, page 18).
8
Recommissioning the Inverter
1. Carry out the necessary tests according to the locally applicable laws, standards and
directives for the correct recommissioning after power assembly replacement. Take the
requirements for component replacements into account (see Section 2.2 "IMPORTANT
SAFETY INSTRUCTIONS", page 7).
2. Ensure that the grounding conductor in the inverter is correctly connected and functions
properly.
3. Mount the upper enclosure lid onto the enclosure and lightly fasten all screws.
4. Tighten the screws of the enclosure lid in the
specified sequence (AF4, torque: 6 Nm ± 0.3 Nm).
18
PVS-STPTL10-RM-xx-10
SMA Solar Technology AG
4
5
2
1
6
3
A
B
C
Replacement Manual

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Nr3-stp-pvs

Tabla de contenido