Outdoor Unit - Haier HSU-24HEK03/R2 Manual De Instalación

Ocultar thumbs Ver también para HSU-24HEK03/R2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

When connecting the cable before installing the indoor unit
Insert the cable from the back side of the unit, then pull it out on the front side.
Loosen the screws and insert the cable ends fully into terminal block, then
tighten the screws.
Pull the cable slightly to make sure the cables have been properly inserted and
tightened.
After the cable connection, never fail to fasten the connected cable with the
wiring cover.
Note
When connecting the cable, confirm the terminal number of indoor and
outdoor units carefully. If wiring is not correct, proper operation can not
be carried out and will cause defect.
connecting wiring:
3
0.75mm
X
connecting wiring:
3G0.75mm
Indoor unit
HSU-24HEK03/R2
HSU-24HEA03/R2
Power cable:
1. If the supply cord is damaged, it must be replaced by the manufacturer or its
service agent or a similar qualified person. The type of connecting wire is H05RN-F
or H07RN-F.
2. If the fuse on PC board is broken please change it with the type of T. 3.15A/250V.
3. The wiring method should be in line with the local wiring standard.
4. After installation, the power plug should be easily reached.
5. A breaker should be incorporated into fixed wiring. The breaker should be all-pole
switch and the distance between its two contacts should be not less than 3mm.
2
POWER
2

Outdoor unit

2
3G2.5mm
Outdoor unit
Installation of Outdoor Unit
Drawing for the installation of indoor and outdoor units
Install according to
Connection of pipes
To bend a pipe, give the roundness as large as possible not to crush the pipe ,
and the bending radius should be 30 to 40 mm or longer.
Connecting the pipe of gas side first makes working easier.
The connection pipe is specialized for R410A.
Forced fastening without careful centering may
Half union
Flare nut
damage the threads and cause a leakage of gas.
Liquid side6.35mm(1/4")
Liquid/Gas side9.52mm(3/8")
Gas side 12.7mm(1/2")
Spanner
Torque wrench
Gas side 15.88mm(5/8")
Be careful that matters, such as wastes of sands, etc. shall not enter the pipe.
The standard pipe length is 5m. If it is over 7m, the function of the unit will be
affected. If the pipe has to be lengthened, the refrigerant should be charged,
according to 20 g/m. But the charge of refrigerant must be conducted by profes-
sional air conditioner engineer. Before adding additional refrigerant, perform air
purging from the refrigerant pipes and indoor unit using a vacuum pump,then
charge additional refrigerant.
CAUTION
Indoor unit
B
A
Outdoor unit
Outdoor unit
Oil trap
B
Indoor unit
A
Connection
Use the same method on indoor unit. Loosen the screws on terminal block and
insert the plugs fully into terminal block, then tighten the screws.
Insert the cable according to terminal number in the same manner as the indoor
unit.
If wiring is not correct, proper operation can not be carried out and controller
may be damaged.
Fix the cable with a clamp.
Attaching Drain-Elbow
If the drain-elbow is used,
please attach it as figure. (Note:
Only for heat pump unit.)
Purging Method:To use vacuum pump
1.
Detach the service port's cap of
3-way valve, the valve rod's cap for 2-way valve
and 3-way's, connect the service port into the projection of charge hose (Iow)
for gaugemanifold. Then connect the projection of charge hose (center) for gau-
gemanifold into vacuum pump.
2.
gaugemanifold, operate vacuum pump. If the scale-
Open the handle at Iow in
moves of gause (Iow) reach vacuum condition in a moment, check 1. again.
3.
Vacuumize for over 15min.And check the level gauge which should read -0.1MPa
(76 cm Hg) at Iow pressure side. After the completion of vacuumizing, close the
handle 'Lo' in gaugemanifold and stop the operation of the vacuum pump. Check
condition of the scale and hold it for 1-2min. If the scale-moves back in spite of
tightening, make flaring work again, the return to the beginning of 3 .
4.
Open the valve rod for the 2-way valve to an angle of
After 6 seconds, close the 2-way valve and make the inspection of gas leakage.
Pipe Diameter(ǿ)
Fastening torque
18N.m
42 N.m
55N.m
60 N.m
Outdoor unit
B
Indoor unit
A
Amax=15m
Max.Elevation:
In case the elevation A is more
than 5m, oil trap shoud be
installed every 5~7m
Max. Length:
Bmax=25m
In case the pipe length B is
more than 7m, the refrigerant
should be charged, according
to 20 g/m.
anticlockwise 90 degrees.
3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hsu-24hea03/r2

Tabla de contenido