Installation
The installation and location of all safety drench showers, eye and eye/face washes must comply
with the requirements of ANSI/ISEA Z358.1.
Read this installation manual completely to ensure proper installation, then file it with the owner
or maintenance department. Compliance and conformity to local codes and ordinances is the
responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any
packaging material. If any parts are missing, do not begin installation until you obtain the missing
parts.
Installation and maintenance of this system must be completed by a qualified plumber and
electrician according to the information contained in this installation manual and in compliance
with all national and local codes.
The ANSI/ISEA Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley
plumbed emergency fixtures require a minimum of 30 PSI (0.21MPa) flowing pressure. Flushing
should be tepid per ANSI Z358.1
Weekly activation must be conducted on all plumbed emergency equipment to ensure a suitable
flushing fluid supply is present and any sediment build up in the supply line is cleared. Inspect
safety equipment monthly to address any maintenance issues ensuring the equipment is in good
operating condition and that there are no signs of wear.
The inspection and testing results of this equipment should be recorded weekly to verify proper
operation. This equipment should be inspected annually to enure compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI/ISEA Z358.1.
For questions regarding the operation or installation of this product, visit www.bradleycorp.com or
call 800-BRADLEY (272.3539).
Product warranties and parts information may also be found under "Products" on our web site at
bradleycorp.com.
Bradley • 215-1082 Rev. L; ECN 17-05-045
IMPORTANT
6/5/2017
S19-300T, S19-300B
3