CONVERSION INSTRUCTIONS
3. Put the new orifice into the orifice removal
tool (B), and then insert the tool into the
burner opening and tighten the new orifice
into the valve.
Repeat this step for all five burners.
Make sure you are using the correct
orifice, which is marked "1.37". (Fig. 62)
4. Rotate the air shutter opening from the
LP setting to the NG setting.
LP: 1/4" open
NG: 1/6" to 1/8" open
(Fig. 63)
Side Burner Conversion
1. Loosen the side burner screws to expose
the side burner valve.
Insert the tool onto the valve and unscrew
Orifice from end of valve. Put the new
orifice into the orifice removal tool and
tighten the new orifice into the valve.
Make sure you are using the correct orifice,
which is marked "1.31". (Fig. 64)
2. Engage burner tube over valve as shown
and tighten the loosened screws .(Fig. 65)
All manuals and user guides at all-guides.com
28
1.37
Air shutter opening to adjust
Loosen
The side burner
B
Fig. 62
Fig. 63
Fig. 64
Fig. 65